Projects:

Construction:

  • Construction of highway Popovec – Marija Bistrica – Zabok with connection to Breznički Hum, section: Zlatar Bistrica – Andraševec, phase I.
  • Construction of the highway Popovec – Marija Bistrica – Zabok with a connection to Breznički Hum; section: Andraševec (Bračak) -Mokrice (D307), phase I
  • Construction of highway Popovec – Marija Bistrica – Zabok with connection to Breznički Hum, section: Zlatar Bistrica – Andraševec, phase II
  • Construction of access roads to Pelješac Bridge, section: Duboka – Sparagovici / Zaradeže
  • Underpass construction at the crossroad of MG2 railway and DC 423 in Slavonski Brod
  • Construction of the southern Kutina bypass (North Column), 1st Phase
  • Construction of I. and II. phase of 1. section of the Vinkovci eastern bypass
  • Construction of a parallel road with a connection over the Krapina River to the state road DC1, phase II
  • Construction of the motorway Beli Manastir-Osijek-Svilaj-Ploče; of section: Sredanci-BiH border
  • Construction of Svilaj Bridge and Access Roads
  • Construction of a new suburban railway line at Gradec-Sveti Ivan Žabno section
  • Constructions on the dismantling of state road D225 section: Zaprešić-Prigorje Brdovečko
  • Mainland – island Čiovo bridge (Phase II): supervision over the construction of connecting roads D315-D8 and D126-Ž613
  • Construction of connecting roads East Bypass Velika Gorica-Airport Zagreb
  • Complete supervision of the reconstruction of state roads II project, phase B, state road D205
  • Construction of the northern pavement and reconstruction of the southern pavement of Petar Svačić Street in Slavonski Brod
  • Construction of highway Popovec-Marija Bistrica-Zabok with a connection to Breznički Hum; section: Andraševec (Bračak) -Mokrice (D307), phase I.
  • Renovation and Construction of State Roads II project, Phase B; section 3: Jelsa-Poljica, on D116
  • Renovation and Construction of State Roads II project, Phase B; Section 18: Ivanić Grad
  • Renovation and Construction of State Roads II project, Phase B; section 15: Petrinja-Gora
  • Construction of the connecting road from Petrinja to the bridge over the Kupa river in Brest
  • Construction of D8, section: Sv.Kuzam-Križišće; equipment and installations
  • Constructions on the relocation of the road D46, section: Stari Mikanovci-Vinkovci -Mirkovci, III. section (Vinkovci zapad – Mirkovci),
  • Construction of the southern bypass of the City of Donji Miholjac, Phase II
  • Construction of the Solin-Klis-sinj (D1) highway second pavement on the following sections: Majdan-Jamani and Jamani-Klis Grlo
  • Construction of mainland – island Pelješac bridge with connection roads
  • Construction of the Velika Gorica bypass on D31 with the connection to the D408
  • Construction of facilities for drainage of faecal waters of the Stomorska on the island of Šolta; First phase of construction, section: Pelegrin-Veli Dolac
  • Construction of state road D2; section: Našice bypass
  • Installation movement and protecting on state road D 8, section: Kaštel Sućurac – Plano, subdivision: Kaštel Stari – Plano node
  • Construction of Split Bypass, section No.1: Plano–Kaštel Sućurac/Kaštel Gomilica
  • Construction and equipping of highway Zagreb – Goričan, section: Goričan – Republic of Hungary
  • Construction of noise protection walls on the Zagreb – Bregana motorway
  • Construction of the route, road and agricultural crossings, and overpass on D515 Đakovačka Satnica, under construction AC Beli Manastir-Osijek-Svilaj-Ploče, section: Osijek-Đakovo
  • Furnishing of Zagreb-Goričan highway, section: Ivanja Reka-Breznički Hum-Varaždin
  • Construction and completion of the Kaštela Subsection: CS Nehaj, CS Kaštel Novi, CS Kaštel Stari and CS Kaštel Lukšić II with associated pressure pipes and gravity collector
  • Construction and equipping of Rugvica node at Bregana – Zagreb – Lipovac, section: Ivanja Reka – Ježevo
  • Construction of sewerage collectors of “E1” and “D” basins and works on the construction of the main water supply pipeline for the supply of artificial tunnels and reconstruction of the water supply network in Jeronim Mileta Street on the reconstruction of the artificial tunnel road in the railway station station in Šibenik
  • Construction of the highway Solin-Klis-Sinj (D1), section: Dračevac-Majdan – Road equipment
  • Construction of highway node Bisko-border of BiH, section: node Akrapi-node Čaporice, 1st phase of construction
  • Construction of state road D 507, section: Krapinske Toplice-Čret
  • Construction of state road D 118, section: pass through Žrnovo on Korčula
  • Construction of the motorway Zagreb-Split, COKP Mala Kapela
  • Construction of the Zagreb-Lipovac motorway; Županja-Lipovac; subsection Županja-Spačva
  • Construction of Zagreb-Split highway, section: Prgomet-Dugopolje, Furnishing
  • Construction of Zagreb-Split highway, section: Vrpolje-Prgomet, Furnishing
  • Construction of Udbina bypass on D1 and highway Udbina-node Gornja Ploča
  • Construction of the connecting road from D 27 to “Node Pirovac”
  • Construction of Zagreb-Split highway, Prgomet-Dugopolje; Furnishing
  • Construction of Zagreb-Split motorway, section: Sv.Rok-Zadar 2; furnishing
  • Equipment of tunnel connection Rijeka-Policentro with necessary installations and signalization
  • State road construction on D 53, Stage II of the section: The western road linkage in Slavonski Brod with the connecting roads

Extraordinary maintenance:

  • Extraordinary maintenance of state road D7 on the 760m long section: Velika Kopanica – Velika Kopanica (A3)
  • Works of extraordinary maintenance of the asphalt pavement on the state road DC 10 – node Sv. Helena-node Vrbovec 1 and node Vrbovec I-node Gradec
  • Extraordinary maintenance of the state road D205 on the Razvor-Risvica section
  • Extraordinary maintenance of state road D119
  • Tunnel Đurmanec repair on D1
  • Mali Stog tunnel repair on D1
  • Great Pillar tunnel repair on D1
  • Extraordinary maintenance of state road D212
  • Extraordinary maintenance of state road D220 at 002 section in lenght of 8,800 m, location: Tijarica-Kamensko (BiH border)
  • Extraordinary maintenance of state road D118
  • Krapina tunnel repair on state road D1, section 003
  • Extraordinary Maintenance of State Road DC7, Sikirevci-Slavonski Šamac
  • Extraordinary maintenance of state road D31 on the Šestak Brdo-Pokupsko section
  • Extraordinary maintenance of state road D212, section 001, length 2.700 m, location: Knezovi Vinogradi
  • Extraordinary maintenance of the state road D220
  • Extraordinary maintenance of state road D2, section Virovitica – Suhopolje
  • Extraordinary maintenance of state road D56
  • Extraordinary maintenance of state road D36 in Pisarovina
  • Extraordinary maintenance of state road D42 section 001
  • Extraordinary maintenance of state road D-42 on section 001, section: Ogulin – Oštarije
  • Extraordinary maintenance of state road D-47 on 001 and 002, section: Bair and Uštica – Tanac
  • Extraordinary maintenance of state road D-50 at 001, location: Otočac
  • Extraordinary maintenance of state road D225 on section Zaprešić – – Harmica

Reconstruction:

    • Reconstruction of the Gromova Bridge in Sisak on the state road DC37
    • Reconstruction of 4 intersections on DC8 state road in Podstrana
    • Reconstruction of “Komora” bridge
    • Reconstruction of state road DC1 on section 008
    • Reconstruction of the State Road DC 206 on section Hum on Sutli
    • Reconstruction of the state road DC24 on Lug Zabočki-Zlatar Bistrica section
    • Reconstruction of state road DC206, location Pregrada
    • Reconstruction and construction of connecting road from M.Gupca to N.Š.Zrinskog (D423) in S.Brod – 1st phase of construction – with bridges on the Glogovica channel
    • Reconstruction of state road D9, section 001: Metković-Opuzen
    • Project for reconstruction and construction of state roads II, phase B, state road D224, section: Komarevo-Brđani
    • Reconstruction of state road D57 on section 001
    • Reconstruction of Mokrice Bridge on D1
    • Reconstruction of intersection of state road D7 and county road Ž4202 in Vrpolje
    • Reconstruction of the state road D525 (Matije Gupca Street) in Pleternica
    • Reconstruction of National Road pavements in TI Osijek, State Road D34, Valpovo Bypass
    • Performing works on the modernization and electrification of the railway line on section Zaprešić-Zabok
    • Reconstruction of the intersection of Jadranska avenija and Avenija Dubrovnik
    • Reconstruction of intersection D30 and D408 in Velika Gorica
    • Reconstruction of state road D 31, section 002, Section: Pokupsko – Glina
    • Reconstruction of the DC212 State Road from DC7 to the Circular Intersection in Kneževi Vinogradi
    • Road reconstruction between ŽC 5031 and ŽC 5033
    • Reconstruction of unpaved state road D 22, section: Moždenec – Sudovec
    • Reconstruction of state road D219, section: Han border of BiH
    • Reconstruction of unpaved state road D 56, Muć – Sinj, section: Sutina-Lučane
    • Reconstruction of state road D38, section: Ruševo-Slobodna Vlast-Levanjska Varoš
    • Reconstruction of state road D 31, section 002, Subsection: Pokupsko – Glina
    • Reconstruction and relocation of power lines, protection and transposition of telecommunication installations, water supply, gas and sewage systems on the Zagreb-Sisak motorway, section Jakuševec – Velika Gorica jug
    • Reconstruction of state road D 50, section: Špilnik-Čovići
    • Reconstruction of the D53 roadway in section 003, G.Slatinik-Podcrkavlje
    • Reconstruction of D29, section through Zlatar
    • Reconstruction of the roadway D51 in section 001, Jakšić-Požega
    • Reconstruction of D1; section: pass through Knin